Ammar, M A (2011) Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows. Journal of Construction Engineering and Management, 137(01), 65–71.

Gull, I (2011) Testing of Strength of Recycled Waste Concrete and Its Applicability. Journal of Construction Engineering and Management, 137(01), 1–5.

Hariga, M and El-Sayegh, S M (2011) Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting. Journal of Construction Engineering and Management, 137(01), 56–64.

Hassan, M M, Odeh, I and El-Rayes, K (2011) New Approach to Compare Glare and Light Characteristics of Conventional and Balloon Lighting Systems. Journal of Construction Engineering and Management, 137(01), 39–44.

  • Type: Journal Article
  • Keywords: Light, artificial; Nighttime; Construction management; Safety; Highways and roads; Disability glare; Balloon lighting; Nighttime construction; Safety;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000253
  • Abstract:
    With the increasing needs to adopt nighttime construction strategies in order to avoid disruption of traffic flow, state agencies are currently experimenting with a new class of light towers known as balloon lights. Compared to regular lighting tower, balloon lights have been reported to reduce glare significantly and to provide more uniform lighting conditions at the site. The objective of this study was to measure light and glare characteristics of two balloon lighting systems in the field. Glare and lighting characteristics of this new class of light towers were compared to a conventional lighting system. For this purpose, field measurements were made of the pavement luminance and the horizontal and vertical illuminances on a predefined experimental grid. Results of this study indicated that while being comparable in terms of wattage and luminous flux, the tested balloon light systems differed in terms of light and glare characteristics. In addition, while conventional light tower provided greater illuminance at the light source than balloon lights, the disability glare was greater for conventional light tower than balloon lights when mounted at the same height. Results of this study revealed that optimum conditions should be sought in the work zone, through which adequate lighting conditions are provided for workers while disability glare is kept below a safe threshold for drive-by motorists. Plotting the maximum veiling luminance ratio (disability glare) against the workable distance provides a simple approach to consider the two factors concurrently in the design of work zone lighting.

Lucko, G (2011) Integrating Efficient Resource Optimization and Linear Schedule Analysis with Singularity Functions. Journal of Construction Engineering and Management, 137(01), 45–55.

Mitropoulos, P and Namboodiri, M (2011) New Method for Measuring the Safety Risk of Construction Activities: Task Demand Assessment. Journal of Construction Engineering and Management, 137(01), 30–38.

Rashidi, A, Jazebi, F and Brilakis, I (2011) Neurofuzzy Genetic System for Selection of Construction Project Managers. Journal of Construction Engineering and Management, 137(01), 17–29.

Regan, M, Smith, J and Love, P E D (2011) Impact of the Capital Market Collapse on Public-Private Partnership Infrastructure Projects. Journal of Construction Engineering and Management, 137(01), 6–16.

Shen, X, Lu, M and Chen, W (2011) Tunnel-Boring Machine Positioning during Microtunneling Operations through Integrating Automated Data Collection with Real-Time Computing. Journal of Construction Engineering and Management, 137(01), 72–85.

Zhou, Q, Fang, D and Mohamed, S (2011) Safety Climate Improvement: Case Study in a Chinese Construction Company. Journal of Construction Engineering and Management, 137(01), 86–95.